Proposal of improvements in the management of construction companies: an international case study
DOI:
https://doi.org/10.20435/inter.v21i3.2042Keywords:
methodology of management, lean management, civil construction, local developmentAbstract
Civil construction has a major impact on local development. However, it can be seen that construction companies, in general, have poor management. This article aims to identify gaps in the management of construction companies and propose improvements. Initially, we carried out a literature review with the identification of problems in construction management, followed by a survey of construction companies in Brazil, India, Mexico, Ukraine, and Germany. Finally, we proposed improvements in the management of civil construction, based on the best practices of different countries.
References
ANDÚJAR-MONTOYA, M. D.; GILART-IGLESIAS, V.; MONTOYO, A.; MARCOS-JORQUERA, D. A construction management framework for mass customisation in traditional construction. Sustainability, v. 7, n. 5, p. 1-29, 2015.
ARROTÉIA, A. V.; AMARAL, T. G.; MELHADO, S. B. Gestão de projetos e sua interface com o canteiro de obras sob a ótica da Preparação da Execução de Obras. Ambiente Construído, Porto Alegre, v. 14, n. 4, p. 183-200, 2014.
BABAR, S.; THAHEEM, M. J.; AYUB, B. Estimated cost at completion: integrating risk into earned value management. Journal of Construction Engineering and Management, v. 143, n. 3, p. 04016104-1 - 04016104-11, mar. 2017.
DANIEL, E. I.; Pasquire, C.; Dickens, G.; Ballard, H. G. The relationship between the Last Planner® System and collaborative planning practice in UK construction. Engineering, Construction and Architectural Management, v. 24, n. 3, p. 407-25, 2017.
DE FILIPPI, G. A.; MELHADO, S. B. Um estudo sobre as causas de atrasos de obras de empreendimentos imobiliários na região Metropolitana de São Paulo. Ambiente Construído, Porto Alegre, v. 15, n. 3, p. 161-73, 2015.
DOBBS, R.; POHL, H.; LIN, D. Y. Infrastructure productivity: how to save $1 trillion a year. McKinsey Global Institute. [S.l.]: Print, 2013.
FARROKHI, F.; MAHMOUDI-HAMIDABAD, A. Rethinking convenience sampling: Defining quality criteria. Theory and practice in language studies, v. 2, n. 4, p. 784, 2012.
FIRJAN. Construção Civil: desafios 2020. Rio de Janeiro, 2014. Disponível em: http://www.firjan.com.br/lumis/portal/file/fileDownload.jsp?fileId=4028808B4E3FB673014E3FF18D3D20D8. Acesso em: 15 set. 2017.
FRANDSON, A.; BERGHEDE, K.; TOMMELEIN, I. D. Takt time planning for construction of exterior cladding. In: CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION, 21., Fortaleza, 2013. Anais [...], Fortaleza: IGLC, 2013.
FREITAG, A. E. B. Fatores críticos de sucesso para adoção da gestão “enxuta” pela indústria da construção civil do estado do Rio de Janeiro. Orientador: Osvaldo Luiz Gonçalves Quelhas. 2015. Tese (Doutorado em Engenharia Civil) − Universidade Fluminense, Niterói, RJ, 2015.
GIL, A. C. Como elaborar projetos de pesquisa. 4.ed. São Paulo: Atlas, 2002.
GRAU, D.; ABBASZADEGAN, A.; TANG, P., GANAPATHY, R., DIOSDADO, J. A combined planning and controls approach to accurately estimate, monitor, and stabilize work flow. In: INTERNATIONAL CONFERENCE ON COMPUTING IN CIVIL AND BUILDING ENGINEERING, 24., Computing in Civil and Building Engineering. 23-25 jun. 2014, Orlando, Florida. Anais […]. American Society of Civil Engineers (Asce), 2014. p. 105-12.
HORSTMAN, A.; WITTEVEEN, W. Performance indicators in the best value approach. Journal for the Advancement of Performance Information & Value, v. 5, n. 2, 2013.
KIM, Y.-W.; BALLARD, G. Management thinking in the earned value method system and the last planner system. Journal of Management in Engineering, v. 26, n. 4, p. 223-28, 2010.
KOSKELA, L.; HOWELL, G.; PIKAS, E.; DAVE, B. If CPM is so bad, why have we been using it so long? In: THE 22TH INTERNATIONAL GROUP FOR LEAN CONSTRUCTION CONFERENCE, 2327 jun. 2014, Oslo, Norway. Anais […]. University of Huddersfield, 2014.
LOWE, R. H.; D’ONOFRIO, F. M.; FISK, M. D.; SEPPÄNEN, O. A comparison of location-based scheduling with the traditional critical path method. In: ANNUAL MEETING AMERICAN COLLEGE OF CONSTRUCTION LAWYERS, 2012, San Francisco. Anais [...]. San Francisco: [s.n], 2012.
MELO, M.; DESCHAMPS, F.; DA COSTA, S. E. G. Application of Lean Construction − a Systematic Literature Review. Journal of Lean Systems, v. 2, n. 3, 2017.
MOURA, C. B.; FORMOSO, C. T. Análise quantitativa de indicadores de planejamento e controle da produção: impactos do Sistema Last Planner e fatores que afetam a sua eficácia. Ambiente Construído: Revista da Associação Nacional de Tecnologia do Ambiente Construído, Porto Alegre, v. 9, n. 3, p. 57-74, jul./set. 2009.
NARBAEV, T.; DE MARCO, A. Combination of growth model and earned schedule to forecast project cost at completion. Journal of Construction Engineering and Management, v. 140, n. 1, p. 04013038, 2013.
NAZÁRIO, L.; AZEVEDO, E. Gestão de projetos na construção civil em Natal – estudo exploratório no mercado imobiliário. In: CONGRESSO INTERNACIONAL DE ADMINISTRAÇÃO, 2016, Natal. Anais [...] , 2016. p. 1-90. http://www.admpg.com.br/2016/down.php?id=2324&q=1. Acesso em: 15 set. 2017.
NASIRZADEH, F.; KHANZADI, M., REZAIE, M. Modelagem dinâmica da alocação quantitativa de risco em projetos de construção. Jornal internacional de gerenciamento de projetos, Amsterdã, v. 32, p. 442-51, 2014.
NETTO, J. T.; QUELHAS, O. L. G.; FRANÇA, S.; MEIRINO, M. J. Estudo comparativo entre as práticas empresariais e a teoria de gerenciamento por Valor Agregado: o caso da construção civil. Ambiente Construído, Porto Alegre, v. 15, n. 3, p. 145-60, set. 2015.
OLIVIERI, H.; GRANJA, A. D.; PICCHI, F. A. Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado. Ambiente Construído, v. 16, n. 1, p. 265-83, 2016.
PROJECT MANAGEMENT INSTITUTE. Guia PMBOK®: um guia para o conjunto de conhecimentos em gerenciamento de projetos. 6. ed. Pennsylvania: PMI, 2017.
RENUKA, S. M.; UMARANI, C.; KAMAL, S. A review on critical risk factors in the life cycle of construction projects. Journal of Civil Engineering Research, v. 4, n. 2A, p. 31-6, 2014.
SEPPÄNEN, O.; EVINGER, J.; MOUFLARD, C. Effects of the location-based management system on production rates and productivity. Construction management and economics, v. 32, n. 6, p. 608-24, 2014.
ZHANG, Y. A framework to improve modular construction manufacturing production line performance. [s.l.]: University of Alberta, 2017.
Downloads
Published
How to Cite
Issue
Section
License
Direitos Autorais para artigos publicados nesta revista são do autor, com direitos de primeira publicação para a revista. Em virtude de aparecerem nesta revista de acesso público, os artigos são de uso gratuito, com atribuições próprias, em aplicações educacionais e não-comerciais.